Building statistics

8   Average monthly registration delay for buildings started. January 1999-November 2002
  Dwellings Other buildings
  1999 2000 2001 2002 1999 2000 2001 2002
January 5.6 4.8 5.2 4.8 7.4 5.9 6.2 5.6
February 4.6 4.6 3.8 4.2 4.8 9.0 5.9 47.1
March 5.5 4.8 4.9 3.5 5.9 4.8 5.3 4.3
April 4.6 3.1 2.6 2.8 4.3 3.4 3.5 3.7
May 2.7 2.0 3.0 3.1 2.9 2.1 2.7 3.3
June 3.8 3.8 4.1 1.9 4.5 1.9 2.7 3.7
July 3.3 3.2 3.6 3.2 3.1 2.7 4.8 2.5
August 3.9 3.2 4.1 3.8 4.1 15.8 2.3 2.2
September 5.5 2.8 3.2 3.1 4.3 26.0 2.7 3.2
October 3.7 2.3 4.5 3.6 5.4 3.1 2.7 3.2
November 3.8 3.3 3.3 3.4 4.2 35.1 3.3 3.8
December 5.6 5.1 4.1   5.7 4.8 5.4  
1  Exclusive 1 building in Oslo (43 000 m2) with 25 months of registration delay, the number is corrected from 5.8 to 2.9.
2  Exclusive 1 building in Bergen (24 500 m2) with 22 months of registration delay and 1 building in Alta (7 800 m2) with 18 months of registration delay, the number is corrected from 6.0 to 4.2.
3  Exclusive 1 building in Trondheim (21 100 m2) with 18 months of registration delay and 1 building in Narvik (16 300 m2) also with 18 months of registration delay, the number is corrected from 5.1 to 3.8.
4  Exclusive 1 building in Fredrikstad (14 000 m2) with 23 months of registration delay and 1 building in Bodø (9 800 m2) with 21 months of registration delay, the number is corrected from 7.1 to 5.8.