Road construction costs up 4 per cent
Road construction costs increased by 4.0 per cent from the fourth quarter of 2009 to the fourth quarter of 2010. The material costs rose by 4.7 per cent, while costs of labour and machinery increased by 4.0 and 3.0 per cent respectively in the same period.
The construction costs of concrete bridges rose the most, by 4.9 per cent. The costs of rock tunnels and open air roads increased by 3.8 and 3.6 per cent respectively.
From the third quarter to the fourth quarter last year the total road construction costs rose by 1.1 per cent.
The maintenance cost of roads increased by 4.4 per cent from the fourth quarter of 2009 to the fourth quarter of 2010. In the same period the construction costs of asphalt work rose by 5.1 per cent.
4th quarter 2010 | Per cent | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
3rd quarter 2010-
4th quarter 2010 |
4th quarter 2009-
4th quarter 2010 |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Road constructions, total | 135.1 | 1.1 | 4.0 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Open air road | 134.3 | 1.1 | 3.6 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Concrete bridge | 140.5 | 1.0 | 4.9 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rock tunnel | 131.2 | 1.2 | 3.8 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
4th quarter 2010 | Per cent | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
3rd quarter 2010-
4th quarter 2010 |
4th quarter 2009-
4th quarter 2010 |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Maintenance of roads, total | 135.4 | 1.2 | 4.4 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Asphalt work | 145.5 | 0.8 | 5.1 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Maintenance in wintertime | 130.5 | 1.1 | 4.2 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Tables:
Additional information
Contact
-
Martin Handeland Skjæveland
E-mail: martin.skjaeveland@ssb.no
tel.: (+47) 40 81 14 17
-
Hanne Beate Høiby
E-mail: hanne.hoiby@ssb.no