New cost indices for road constructions
From the second quarter of 2004, new weights are used in the calculation of the cost index for road constructions. In addition, the construction cost index for water plants will no longer be produced.
As a result of a sharp increase in steel prices, construction costs of concrete bridges rose by 3.8 per cent from the first quarter to the second quarter of 2004. In the same period, costs of road constructions and rock tunnels increased by 2.1 and 1.3 per cent respectively. Maintenance costs for roads increased by 1.4 per cent.
New indices for open air roads and rock tunnels
From the first quarter of 2004, two new indices are published. These are the construction cost index for open air roads and the construction cost index for rock tunnels. The construction cost index for bridges and quays has been replaced by the index for concrete bridges.
The name of the index has been changed from the construction cost index for main road and provincial road to the construction cost index, road constructions. The index is weighted as follows: open air roads 59 per cent, rock tunnels 19 per cent and concrete bridges 22 per cent.
Construction cost index for road maintenance
From the first quarter of 2004, the number of maintenance indices has been reduced to three, i.e. the maintenance of roads total index, the index for asphalt work and the index for winter maintenance. The asphalt work and winter maintenance indices are included in the total index of maintenance with weights of 24 and 28 per cent respectively.
Construction cost index, road constructions.
1st Quarter 2004=100 |
2nd Quarter 2004 | Change in per cent | ||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1st-2nd Quarter 2004 |
2nd Quarter 2003-
2nd Quarter 2004 |
||||||||||||||||||||||||||||||||||||||
Road constructions, total | 102.3 | 2.3 | 3.9 | ||||||||||||||||||||||||||||||||||||
Open air road | 102.1 | 2.1 | .. | ||||||||||||||||||||||||||||||||||||
Concrete bridge | 103.8 | 3.8 | .. | ||||||||||||||||||||||||||||||||||||
Rock tunnel | 101.3 | 1.3 | .. | ||||||||||||||||||||||||||||||||||||
Cost index for maintenance of roads. 1st Quarter 2004=100 |
2nd Quarter 2004 | Change in per cent | ||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1st-2nd Quarter 2004 |
2nd Quarter 2003-
2nd Quarter 2004 |
||||||||||||||||||||||||||||||||||||||
Maintenance of roads, total | 101.4 | 1.4 | 3.2 | ||||||||||||||||||||||||||||||||||||
Asphalt work | 102.3 | 2.3 | .. | ||||||||||||||||||||||||||||||||||||
Maintenance in wintertime | 101.0 | 1.0 | 2.9 | ||||||||||||||||||||||||||||||||||||
New basis
The indices are calculated using the first quarter of 2004 as the base period. Previous figures have been recalculated according to the new base period.
New tables with previous figures
Tables:
Additional information
Contact
-
Martin Handeland Skjæveland
E-mail: martin.skjaeveland@ssb.no
tel.: (+47) 40 81 14 17
-
Hanne Beate Høiby
E-mail: hanne.hoiby@ssb.no
tel.: (+47) 40 81 14 28