Plumbing costs up 1 per cent
The construction costs of plumbing work in office and commercial buildings rose by 1.0 per cent From June to July this month. The material costs increased by 1.5 per cent in the same period.
In the period July 2007 to July 2008, the construction costs of plumbing works rose by 7.3 per cent. The cost of sanitary installations and heating installations increased by 5.6 and 9.2 per cent respectively in the same period.
Weigth per cent1 | July 2008 | Change in per cent | |||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
June 2008-
July 2008 |
July 2007-
July 2008 |
||||||||||||||||||||||||||||||||||||||
Plumbing costs total | 100.0 | 157.8 | 1.0 | 7.3 | |||||||||||||||||||||||||||||||||||
Administrative expenses | 17.3 | 133.9 | 0.2 | 4.6 | |||||||||||||||||||||||||||||||||||
Labour costs | 26.0 | 145.0 | 0.0 | 5.1 | |||||||||||||||||||||||||||||||||||
Materials | 55.3 | 171.0 | 1.5 | 8.6 | |||||||||||||||||||||||||||||||||||
Sanitary installastions | 54.5 | 156.2 | 0.5 | 5.6 | |||||||||||||||||||||||||||||||||||
Materials | 32.7 | 166.2 | 0.7 | 6.0 | |||||||||||||||||||||||||||||||||||
Heating installations | 45.5 | 159.6 | 1.6 | 9.2 | |||||||||||||||||||||||||||||||||||
Materials | 22.6 | 177.9 | 2.6 | 12.5 | |||||||||||||||||||||||||||||||||||
1 |
The sum of weights for administrative expenses, labour costs and materials deviate
from 100 because transport costs are excluded. |
Tables:
Find more figures
Find detailed figures from Construction cost index for plumbing works in office and commercial buildings
Contact
-
Hanne Beate Høiby
E-mail: hanne.hoiby@ssb.no
tel.: (+47) 40 81 14 28
-
Mona Takle
E-mail: mona.takle@ssb.no
tel.: (+47) 40 81 14 12