Construction cost index for road construction

To the Top
The 3 steps are Choose table, Choose variable and Show result. You are currently at Choose variables

03649: Construction cost index for water power plant (1st quarter 2004=100) (closed series) 1985K1 - 2004K1

Åse Wilhelmsen, Statistics Norway
+47 6288 5461
Arild Thomassen, Statistics Norway
+47 6288 5427
2004-10-29 10:00
Construction cost index:
index
Construction cost index:
Middle of quarter
Construction cost index:
1. kv. 2004=100
Statistics Norway
External PROD
Now you have come to the page, Choose variable. This page give you the oportunity to select which variables and values you want to display in your result of the table. A variable is a property of a statistical unit. The page is divided into several boxes, one for each variable, where you can select values by click to highlight one or more values. It always starts with the statistics variable which is the main value counted in the table.
Navigating with keyboard and screenreader. Select multiple object in row: SHIFT+arrow down/up. To select a single value in the listbox: Windows:Hold Ctrl + arrow down. Then release Ctrl and press space. Repeat. Mac:CMD+arrow down/up. Then release CMD and press spacebar. Repeat. (Works only in Chrome, not in Safari). To exit listbox with values selected, press TAB-key.
Mandatory

Selected 1 of total 1

Mandatory
Field for searching for a specific value in the list box. This is examples of values you can search for.1985K1 , 1985K2 , 1985K3 ,

Selected 1 of total 77

Mandatory
Field for searching for a specific value in the list box. This is examples of values you can search for.Water power plant, total , Water power plant, materials , Tunnel, total ,

Selected 0 of total 10

Number of selected data cells are:
(maximum number allowed is 300 000)
Number of selected cells exceeds the maximum allowed 300 000
The table is no longer updated.